How to buy fire doors for a hotel or housing project

Turn a door schedule into a comparable tender. Specify the opening, the complete doorset and the evidence your project team needs before it approves a model.

Request doors for my project

Build the schedule opening by opening

List guest-room entrances, shared corridors and service rooms separately. Record dimensions, wall construction, handing, number of leaves and quantity. Have the project’s competent designer establish fire and smoke requirements for each opening under local rules.

Read the scope behind EI30 or EI60

In European fire-resistance classification, E denotes integrity and I insulation. The number is a duration in minutes under test conditions. Clarify the EI₁ or EI₂ requirement and check whether the classification report covers your size, supporting wall, frame, glazing, hardware and single- or double-leaf arrangement.

Check acoustic evidence and the delivery schedule

For guest-room entrances, state the acoustic target and measurement method. Request a report for the proposed assembly, including the threshold and seals. Before approving production, reconcile signed drawings, installation instructions, floor-by-floor packing and the project’s opening numbers.